Skip to main content
Plumbing
Mechanical
Fit Out
Electrical
Plumbing
Gas
Air Conditioning
Gas
Mechanical
Fit Out
Electrical
Plumbing
Gas
Air Conditioning
Air con new
Mechanical
Fit Out
Electrical
Plumbing
Gas
Air Conditioning
Fit Out
Mechanical
Fit Out
Electrical
Plumbing
Gas
Air Conditioning
Mechanical
Mechanical
Fit Out
Electrical
Plumbing
Gas
Air Conditioning
electricity new
Mechanical
Fit Out
Electrical
Plumbing
Gas
Air Conditioning

Our team has an extensive range of capability’s that allow us to support our clients with the installation, repair and ongoing maintenance within all key disciplines.

building maintenance services

BRIEF: RUBBER EXPANSION BELLOW LIFECYCLE REPLACEMENT

DURATION: 3 MONTHS          APPROX. VALUE: £50K – £100K

SCOPE OF WORKS: As part of the buildings lifecycle analysis survey, it was identified that 102 bellows on both the LTHW and CHW systems needed replacing due to their age and condition.
Our projects and technical teams needed to ensure that all of the systems remained operational during normal working hours, so a programme was developed outside of normal working hours to replace the bellows systematically.
To provide an overview we would offer the below;

  • Removal of the existing bellows and installation of new.
  • Liquid Nitrogen pipe freezes where required for approximately 30% of the bellows as the isolation
    valves failed.
  • Replacement of any failed isolation valves.
  • Scaffolding erected in some locations to provide access.
  • Lagging of all new bellows installed.